In this page you learn what is a use case and find a list of railML® use cases.

While the emphasis of the railML® Wiki lies in documenting single elements in a bottom-up approach, we also try to help users to capture the concepts of railML® via examples and use cases in a top down approach.

What is a use case?

A use case can be defined as a single task, performed by the end user of a system, that has some useful outcome[1][2]. It is described as a list of steps (actions or events) to achieve this outcome.

A use case in terms of railML® is an application of data exchange between at least two IT systems in the railway domain, where railML® can be used as a format and language for the data to be exchanged. The aim of the use case description is to formulate requirements on the technical implementation of the data exchange.

What distinguishes a use case from an example is, that examples will typically consist of pieces of railML®-code, whereas use cases will typically be formulated in natural language or Unified Modeling Language () (UML). Examples are solutions to use cases.

railML Use Cases

Categories by Subschema

Use case pages get automatically categorized by their directing subschema:

CO Use CasesIL Use CasesIS Use CasesRS Use CasesTT Use Cases


List of implemented use cases

View/edit list on the separate source page

Legend (↓)
Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Description (EN) Description (DE) Abbreviation Reported by Status
how to interpret the status
Edited
IL IS 3.1 3.3 Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung IMED writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented FIXME Page does not exist yet.
IS 3.1 3.3 Network statement of an infrastructure manager[3] Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST writer: Správa železnic (former: SŽDC) / ProRai / Bane NOR,
reviewer: NEST working group
implemented FIXME Page does not exist yet.
IL IS 3.1 3.3 Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplansimulation
(ehemals: Leistungsfähigkeit Simulation)
RSIM writer: Jernbanedirektoratet / Bane NOR
(former: Jernbanedirektoratet Capacity Dpt),
reviewer: ETCS subgroup of Interlocking working group
implemented FIXME Page does not exist yet.
IS IL 3.1 3.3 Schematic Track Plan Schematische Gleisplandarstellung SCTP writer: Jernbanedirektoratet / Bane NOR,
reviewer: SCTP working group
implemented FIXME Page does not exist yet.
TT IL, IS, RS 3.2 3.3 Integrated Traffic Management System Integriertes Verkehrsmanagement ITMS writer: Thales Germany;
reviewer: TT developer working group
implemented FIXME Page does not exist yet.
IS IL 3.2 3.3 ETCS track net ETCS Streckenatlas ETCS writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented FIXME Page does not exist yet.
ETCS track net: Input for Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der allgemeingültigen Streckendateninformationen (vom Netzbetreiber an den Lieferanten) ETCS-a writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented FIXME Page does not exist yet.
ETCS track net: Output of Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der Ergebnisdaten der Projektierung (vom Lieferanten an den Netzbetreiber) ETCS-b writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented FIXME Page does not exist yet.
ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement ETCS Streckenatlas: Aktualisierung der Streckendaten vor Balisengruppenplatzierung ETCS-c writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented FIXME Page does not exist yet.
TT IS, RS 3.2 3.3 Passenger information at stations Fahrgastinformation am Bahnhof PISY writer: PSI Transcom (May 20th 2015);
reviewer: init
implemented FIXME Page does not exist yet.
TT IS, RS, IL 3.3 3.3 Run Time Calculation Input Data Eingangsdaten für die Fahrzeitrechnung RTCI writer: Jernbanedirektoratet / Bane NOR,
reviewer: TT developer working group
implemented FIXME Page does not exist yet.
Run Time Calculation Input Data – Infrastructure properties Eingangsdaten für die Fahrzeitrechnung - Infrastruktur Eigenschaften RTCI-a writer: Jernbanedirektoratet,
reviewer: TT developer working group
implemented
Run Time Calculation Input Data – Rolling stock properties Eingangsdaten für die Fahrzeitrechnung - Fahrzeug Eigenschaften RTCI-b writer: Jernbanedirektoratet,
reviewer: TT developer working group
implemented
Run Time Calculation Input Data – Timetable properties Eingangsdaten für die Fahrzeitrechnung - Fahrplan Eigenschaften RTCI-c writer: Jernbanedirektoratet,
reviewer: TT developer working group
implemented
TT IS, RS 3.3 3.3 Long Term Circulation Planning Langfristige Umlaufplanung LTCP writer: IVU & TT developer working group,
reviewer: TT developer working group
implemented FIXME Page does not exist yet.
IS TT 3.3 3.3 Possession Management Daten für Betra und Gleissperrungen POMA writer: Siemens Mobility Germany (January 10th 2022);
reviewer: HaCon Ingenieurgesellschaft
implemented FIXME Page does not exist yet.
Legend:

Red: No railML.org e.V. partner so far reviewed this use case.
Green: Review was performed by the railML.org e.V. partner given in the table.
Priority: "X" means that work is finished, but Use case will be updated when needed by the community. "1" is the highest priority.
Status: How to interpret the status


List of emerging use cases

View/edit list on the separate source page

Legend (↓)
Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Description (EN) Description (DE) Abbreviation Reported by Status
how to interpret the status
Edited
TT IS, IL, RS 3.4 Long Term Strategic Timetabling[4] Langfrist-Fahrplanerstellung LTST writer: SMA+Partner (December 22nd 2016);
reviewer: HaCon Ingenieurgesellschaft (June 28th 2022);
also used in ISO RailDax project
consolidated FIXME Page does not exist yet.
TT IS, RS 3.4 Service Concept for a Tender[4] Ausschreibungsfahrplan SCOT
(former TTFT)
writer: iRFP (May 21st 2015);
reviewer: IVU Traffic Technologies (September 22nd 2016); Jernbanedirektoratet
consolidated FIXME Page does not exist yet.
TT 3.4 Replacement Service Planning Schienenersatzverkehr RPLS writer: TT developer working group (July 10th 2025);
reviewer: TT developer working group (October 20th 2025)
consolidated FIXME Page does not exist yet.
TT 3.4 Capacity Reservation for Tracks CARE writer: HaCon Ingenieurgesellschaft (July 22nd 2025);
reviewer: TT developer working group (October 20th 2025)
consolidated FIXME Page does not exist yet.
IS 3.4 Infrastructure Asset Status Representation[5] Zustandsdaten IASR writer: DLR for IN2Rail projectreviewer: ERDMANN-Softwaregesellschaft consolidated FIXME Page does not exist yet.
IS 3.4 Maintenance Planning for Infrastructure[5] Instandhaltungsdaten MAPI writer: IDX4rail consortium reviewer: ZEDAS GmbH consolidated FIXME Page does not exist yet.
IS 3.4 Track Geometry and Alignment Gleisgeometrie und Trassierung TRGE writer: ÖBB-Infrastruktur (May 2nd 2017) reviewer: ERDMANN-Softwaregesellschaft consolidated FIXME Page does not exist yet.
IS 3.4 Automated Train Operation Information Automatischer Zugbetrieb ATOI writer: Hitachi Rail GTS Germany outlined FIXME Page does not exist yet.
IS RS 3.4 Route Compatibility Check Input Data Fahrzeug-Strecken-Kompatibilitätsprüfung RCCI writer: ÖBB Infrastruktur outlined FIXME Page does not exist yet.
Route Compatibility Check Input Data – RCCI-a Fahrzeug-Strecken-Kompatibilitätsprüfung – RCCI-a RCCI-a writer: ÖBB Infrastruktur outlined
Route Compatibility Check Input Data – RCCI-b Fahrzeug-Strecken-Kompatibilitätsprüfung – RCCI-b RCCI-b writer: ÖBB Infrastruktur outlined
IS TT, RS Driver Advisory System (DAS) Fahrerassistenzsystem DASY writer: Siemens Mobility Germany draft FIXME Page does not exist yet.
IS Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC writer: Bahnkonzept draft FIXME Page does not exist yet.
TT IS, IL, RS Passenger information inside the train Fahrgastinformation im Zug PISV writer: Interautomation (January 17th 2017);
reviewer: PSI Transcom and iRFP
draft FIXME Page does not exist yet.
TT IS, RS, CO Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU Traffic Technologies (May 21st 2015);
reviewer: HaCon Ingenieurgesellschaft
consolidated FIXME Page does not exist yet.
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten SHFT writer: ÖBB Personenverkehr;
reviewer: init
consolidated FIXME Page does not exist yet.
TT IS, RS Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (May 21st 2015);
reviewer: IVU Traffic Technologies (September 22nd 2016)
consolidated FIXME Page does not exist yet.
TT IS, RS Timetable Information Fahrplanauskunft TINF writer: HaCon Ingenieurgesellschaft (March 13th 2015);
reviewer: IVU Traffic Technologies
consolidated, under revision FIXME Page does not exist yet.
IS IL, TT, RS Capacity Planning Kapazitätsplanung CAPL writer: Bane NOR (erstwhile: JBV) draft FIXME Page does not exist yet.
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Mobility Switzerland;
draft FIXME Page does not exist yet.
IS Positioning and Map-Matching Positionierung und Kartenvergleich POSI writer: DLR draft FIXME Page does not exist yet.
IS IL Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB writer: Czech Technical University Prague draft FIXME Page does not exist yet.
TT IS, RS Slot ordering[6] Trassenbestellung writer: SMA+Partner (September 17th 2016);
reviewer: iRFP
draft FIXME Page does not exist yet.
IS Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED writer: Bombardier Transportation draft FIXME Page does not exist yet.
TT IS TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA;
reviewer: Bahnkonzept
draft FIXME Page does not exist yet.
RS IS, TT Traction power supply simulation Simulation der Bahnstromversorgung writer: Institut für Bahntechnik draft FIXME Page does not exist yet.
Legend:

Red: No railML.org e.V. partner so far reviewed this use case.
Green: Review was performed by the railML.org e.V. partner given in the table.
Priority: "X" means that work is finished, but Use case will be updated when needed by the community. "1" is the highest priority.
Status: How to interpret the status


List of inactive use cases

If you want to reactivate your inactive use case, write a post on the railML® forum (link to the railML® website). For more information about use cases you can also follow our UC guideline.

Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Description (EN) Description (DE)
Abbreviation
Reported by Status
How to interpret the status
Reason
Why is this UC on hold?
IS RS 3.1 3.3 RINF Reporting RINF Meldung RINR writer: SNCF Réseau implemented merged into NEST
IS TT, IL 3.2 3.3 Traffic Management Plan TMPL writer: Bombardier Transportation implemented merged into ITMS
TT IS, RS 3.2 3.3 Timetabling Fahrplanerstellung ISTT writer: ProRail implemented merged into RTCI, ITMS, NEST, POMA and others
IS 3.4 Rail Inspection Data Schienenprüfdaten RIND writer:DZSF & ZEDAS
reviewer: ERDMANN-Softwaregesellschaft
draft merged into IASR
TT ? Automatic Route Setting (ARS)
Automatic Train Supervision (ATS)
Zuglenkung writer: Toshiba Corporation?;
reviewer: PSI Transcom
postponed Currently no demand from community
IL ? Data preparation for signalling Datenbereitstellung für Stellwerkssysteme DPRS writer: EULYNX postponed EULYNX withdrew from development
TT ? Operational simulation timetable Betriebssimulation Fahrplan writer: Open Track Railway Technology?;
reviewer: SMA+Partner
postponed Currently no demand from community
IS Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur RAIV postponed Only outdated version available
IL IS Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS writer: Thales Austria postponed Currently no demand from community
IL IS Hardware and cable plan Aussenanlage und Kabelplan postponed Currently no demand from community
IS IL CAD for railway signaling CAD für Zugsignalisierung CASP writer: Railcomplete AS postponed Currently no demand from community
IL IS, TT Interlocking engineering for signalling Stellwerkstechnik für Signalisierung writer: Bane NOR (former: Jernbaneverket Signalling Dpt) draft
IS IL Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft
IS IL Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL writer: ETCS subgroup of Interlocking working group draft
IS NRE Reporting NRE Meldung NRER writer: ÖBB Infrastruktur draft
Legend:

Red: No railML.org e.V. partner so far reviewed this use case.
Green: Review was performed by the railML.org e.V. partner given in the table.
Priority: "X" means that work is finished, but Use case will be updated when needed by the community. "1" is the highest priority.
Status: How to interpret the status

How to interpret the status

Status Description Participation
railML® community
reporting party
railML® schema coordinator
railML® governance board
railML® schema development group
Phase
pre development
outlined The use case has been outlined, a rough idea has been discussed but there is no document, nor draft of one yet. Usually no article about this use case is available in the Wiki yet, however, sometimes some basic ideas will have been published ×
draft A member of the community has submitted a draft of the use case description. This draft is available in the Wiki and can be found above.
consolidated The submitted draft of the use case description has been reviewed by another community member and the schema coordinator has accepted it. × × ×
development
in progress The work for integrating the use case requirements into the railML® schema has begun. A working group is discussing the use case and developing possible additions to the schema. Interested parties are invited to join the working group. × ×
implemented The requirements of this use case have been implemented into the railML® schema. The implementation work of the working group is done. However, not all documents have been finished (PDF documentation of the use case). ×
released The previously implemented use case has been fully documented and is thus released. ×
 
postponed If an unfinished use case is not being updated for several months and no members of the community have expressed interest in following up with it, the use case will be listed as postponed.
×=participates — ☒=is responsible

How to contribute a use case

Generally speaking, contributions to railML® and this Wiki are appreciated. For contributing use cases, please follow our UC guideline.